Skip to the content

Drawing and document management for UK main contractors.

Stratum keeps a project's drawing register, revisions, transmittals, comments, RFIs and technical submittals in one place, so the design team, the subcontractors and the site team all work from the current drawing.

Project
Tenter Yard
Drawing no.
TY-ARC-ZZ-ZZ-DR-A-2001
Revision
P01
Status
Preliminary
Note
Sample project. Computer-generated image of a fictional building.

What it does

One record of a project's design information: who issued what, when, what was said about it, and what is approved to build from.

The drawing register

Every drawing has one line: its number, title, originator, current revision and status. Earlier revisions stay on the record with their files, so nobody has to ask which sheet is current.

A sample drawing register
Drawing no.TitleOriginatorRevStatusDate
TY-ARC-ZZ-ZZ-DR-A-2001Front elevationFor ConstructionFront elevationArchitect AC02For Construction14 Mar 2026
TY-ARC-ZZ-01-DR-A-1101First floor GA planFor CommentFirst floor GA planArchitect AP04For Comment11 Mar 2026
TY-STR-ZZ-00-DR-S-3001Foundation layoutFor ConstructionFoundation layoutStructural engineer AC01For Construction27 Feb 2026
TY-MEP-ZZ-01-DR-M-2101Ventilation layout, first floorFor InformationVentilation layout, first floorM&E consultant AP02For Information6 Mar 2026
TY-ARC-ZZ-RF-DR-A-1401Roof planPreliminaryRoof planArchitect AP01Preliminary3 Mar 2026
The register screen, shown with sample data.

Filing what comes in

Upload a batch of PDFs, or email them to the project's address. Stratum reads the number, title, revision and status from each title block and files the drawing under the company that issued it.

Anything it is not sure of is held for a person to check, with the reason given. It never guesses a company.

28 filed2 need a look

  • TY-STR-ZZ-00-DR-S-3002_C01.pdfStructural engineer A

    Older than the current revision (C02).

  • TY-CNB-ZZ-01-DR-M-2104_P01.pdfSent by email

    Company not recognised: code CNB, title block “CONSULTANT B LTD”.

An upload result, shown with sample data. The reasons are worded as the product words them.

Also in each project

Each project switches on the modules it needs.

Transmittals
Issue drawings and documents by transmittal. The record shows what was sent, to whom and when, and whether it has been opened and downloaded.
Comments and RFIs
Run comment cycles on drawings and raise RFIs, each tracked to close-out. An RFI can be answered by replying to its email.
Technical submittals
Review submittals with Status A, B and C responses.
Design programme and key dates
Drawings link to the design programme, beside the project's key dates and lead times.
M&E and statutory services
Each M&E discipline has a lead consultant and a lead subcontractor, and their drawings go through M&E review. Statutory services sit beside them: each utility connection, tracked stage by stage.
Planning and building control
A register of planning conditions and building control requirements: what was submitted to discharge each one, and the decision. The Principal Designer's compliance matrix sits beside it.
Documents
Specifications, reports and other project documents in one library, filed by category.
Site records
Progress photos, defects, delivery tickets, waste paperwork and mileage, recorded on a phone. Defects go to the company responsible, who close them out with a photo.

Approval stays with the main contractor.

Stratum does the reading and the filing. People decide what is built from.

For Construction waits
A For Construction drawing is held until the main contractor approves it. A project can choose to issue them automatically, and only an owner or admin of the company can change that.
Held drawings stay private
A held drawing cannot be seen by subcontractors, consultants or clients until it is confirmed.
Access follows the role
Each person sees what their company and their role allow, set in a permissions grid for your own team.
Assistants work within permissions
If your team uses an AI assistant such as Claude, it can be connected to a Stratum account. It can only do what that person can do, everything it does is labelled as the assistant's, and nothing can be deleted through it. Assistants are off until a company admin switches them on.

The title-block check

Where a project issues For Construction drawings automatically, every value is first checked against the sheet's own text. Change the revision the upload claims. This is the check a real upload goes through, run here on a sample sheet.

The upload says

The title block says

C01

Held for a person

Title block revision C01 ≠ uploaded C02

Who uses it

Design managers and document controllers

Run the register, the design programme and sign-off.

How they get in: Company account

Consultants and subcontractors

Issue their drawings, answer comments and reply to RFIs.

How they get in: Portal, secure link or email

Clients and clients' agents

Check the current drawings, key dates and published progress photos without asking for a report.

How they get in: Portal

Site teams

Record progress photos, defects, delivery tickets and waste paperwork where they happen.

How they get in: Phone

Getting started

There is no self-service sign-up. We set each company up ourselves, so the first step is a conversation.

  1. Tell us about the project

    Use the form. We reply by email.

  2. We set up your account

    Your company account and first project, with the modules it needs.

  3. Bring in the team

    Add your consultants, subcontractors and client to the project directory. They sign in to a portal showing what you have opened to them.

Make an enquiry

Tell us about your project and we'll set up your account.

Already have an account? Sign in